12/11/13 - Integration meeting notes (Participants: Chris H., Seppo, Mark, Josh, Jack)

Mark showed chamber design with Al conduits from preamp boxes, going to junction box. Conduit might stress the preamps. Have ordered braided shielding cables instead and will test them. Will leave 4 Al conduits in our model for now, but will probably go with the braided cables in the future.

Need some sort of rack and/or strain relief next to chamber to support braided cables, junction box.

Lead wall needs to come out of model. Not needed for n3He.
Seppo: model should show one complete tube from concrete wall to SF, needed for radiation safety.

Mark commented that we will need 4 pt alignment stand for SF, similar to chamber.
We need to start thinking about support for SF. Seppo mentioned that we could use a plate to extend the table that the chamber sits on, then the SF could mount to it as well.

Seppo: n3He field support will also need vibration isolation, soft support, should not be complicated.

Josh: showed cradle transport system for moving chamber in and out of coils, could also possibly be used for SF.

Chris and Seppo discussed SF mounting: sits on a V-shaped base, which has up-down, left-right adjustment built in (Jack has engineering ideas for this)

Jack and Seppo discussed the timing and plan of dismounting NPDG before installing n3He. Should begin at start of summer shutdown.

Jack mentioned we need to get a preliminary version of our experimental design for the ProE software the ORNL engineers use. STEP is the preferred file format to give to them.

Jack also mentioned that we need to put fiducial markers on our components so that they can be surveyed.

We all agreed that we need to meet at least once more before Jan. 8-9 review meeting.

PDF files of the experimental design will be needed so that presenters can show them at the review. Josh will provide.