The n-3He Experiment at SNS : Beam


Subtask: Beam

Manager:

9/25/13 Teleconf


10/2/2013 Teleconf

- Kabir working on operating XY table
- has it working on hyper, tried porting to another computer with USB parallel port dongle, but appears the driver was not installed

12/04/2013 Teleconf

- for the beam alignment we need to learn how polarization depends on divergence angle and energy, Chris is doing calculations
- by the readiness review Jan-8-9 we need to have preliminary MCNP results - Nadia is working for this









Probing The Hadronic Weak Interaction