October 30, 2013 n3He Meeting, 9 AM, JINS
Phone conference info: 877-930-6144, passcode 8420216#
Order of Topics to Discuss:
1. Chamber status and steps to be ready in January
2. Front electronics - requirements for January - what are the actions
3. DAQ - we need to know detailed plans for daq; how the data is collected, what hardware we need new/old, what actions we have to do to be ready in January
(Kabir's slides) (Irakli's slides)
4. Spin flipper - do we have a version of spin flipper ready for January or do we need to have a dummy SF
prelim RFSF.pptx
5. Discussion of Physics of Alignment - Chris C.
6. Discussion of Detector Alignment
7. Neutron Beam Physics - Nadia (
slides)
8. Mechanical Design and Integration - Josh (
slides)