10/22/2014 Collaboration meeting

Plots.pptxBFieldData_Oct22_14.pdf


6/18/2014 Collaboration Meeting:

Drawings:XY Scanner Mount:
PowerPoint Slides: XY Scanner Mount

Sled and V-Block Drawings:

A060-1 ; A061-1 ; A061-2 ; A061-3 ; A062-1 ; A062-2 ; A062-3 ; A062-4
Final Signed Drawings:FUND13N3HE10M8U8713A060.pdfFUND13N3HE10M8U8713A061.pdfFUND13N3HE10M8U8713A062.pdf

Four Jaw Collimator:

A050-1 ; A051-1 ; A051-2 ; A051-3 ; A051-4 ; A053-1 ; A053-2 ; A053-3 ; A054-1 ; A054-2 ; A054-3
Final Signed Drawings:FUND13N3HE10M8U8713A050.pdfFUND13N3HE10M8U8713A051.pdfFUND13N3HE10M8U8713A052.pdfFUND13N3HE10M8U8713A054.pdf

1/10/2014 Alignment Meeting

Meeting Minutes(pdf)

5/1/2014 Alignment Meeting

Alignment Notes: (PowerPoint slides)
Laser Mount :(PowerPoint slides)
B-field Alignment: (PowerPoint slides)
Meeting Minutes (pdf)
Minutes(5-01-2014): (Word Document)

For 5/7/2014 Collaboration Meeting

Beam Scan Mount (PowerPoint slides)
Track-Sled: (PowerPoint slides)

For 5/14/2014 Collaboration Meeting

Four Jaw Collimator (PowerPoint slides)



















Probing The Hadronic Weak Interaction