10/22/2014 Collaboration meeting
6/18/2014 Collaboration Meeting:
Drawings:
XY Scanner Mount:
PowerPoint Slides:
XY Scanner Mount
Sled and V-Block Drawings:
A060-1 ;
A061-1 ;
A061-2 ;
A061-3 ;
A062-1 ;
A062-2 ;
A062-3 ;
A062-4
Final Signed Drawings:
FUND13N3HE10M8U8713A060.pdfFUND13N3HE10M8U8713A061.pdfFUND13N3HE10M8U8713A062.pdf
Four Jaw Collimator:
A050-1 ;
A051-1 ;
A051-2 ;
A051-3 ;
A051-4 ;
A053-1 ;
A053-2 ;
A053-3 ;
A054-1 ;
A054-2 ;
A054-3
Final Signed Drawings:
FUND13N3HE10M8U8713A050.pdfFUND13N3HE10M8U8713A051.pdfFUND13N3HE10M8U8713A052.pdfFUND13N3HE10M8U8713A054.pdf
1/10/2014 Alignment Meeting
Meeting Minutes(
pdf)
5/1/2014 Alignment Meeting
Alignment Notes: (PowerPoint slides)
Laser Mount :(PowerPoint slides)
B-field Alignment: (PowerPoint slides)
Meeting Minutes (
pdf)
Minutes(5-01-2014): (Word Document)
For 5/7/2014 Collaboration Meeting
Beam Scan Mount (PowerPoint slides)
Track-Sled: (PowerPoint slides)
For 5/14/2014 Collaboration Meeting
Four Jaw Collimator (PowerPoint slides)
Probing The Hadronic Weak Interaction