Work package manager: Chris Crawford

Table of Contents

Manuals
Sample data file:
DAQ Subprojects
Analysis Subprojects
Open Issues for the DAQ Module configuration
Configuration parameters to log in the run database
Primary measurement with ACQ164 DAQ
9/25/13 DAQ Meeting
10/2/2013 DAQ Meeting
11/6/2013 Organizational Teleconference
Minutes
11/13/2013 DAQ/Analysis Meeting
11/27/2013 DAQ/Analysis Meeting
12/04/2013 DAQ Meeting
12/05/2013 DAQ Meeting
12/18/2013 DAQ Meeting
1/15/2014 DAQ Meeting
1/22/2014 DAQ Meeting
1/29/2014 DAQ Meeting
2/5/2014 DAQ Meeting
2/19/2014 DAQ Meeting
3/5/2014 DAQ Meeting
3/12/2014 DAQ Meeting
4/09/2014 DAQ Meeting
4/17/2014 DAQ Meeting
4/17/2014 DAQ Meeting
4/23/2014 DAQ Meeting
4/30/2014 DAQ Meeting
5/7/2014 DAQ Meeting
5/14/2014 DAQ Meeting
5/21/2014 DAQ Meeting
6/11/2014 DAQ Meeting
6/18/2014 DAQ Meeting
6/25/2014 DAQ Meeting
7/02/2014 DAQ Meeting
9/17/2014 DAQ Meeting
10/1/2014 DAQ Meeting
10/15/2014 DAQ Meeting
12/3/14 DAQ Meeting
01/07/15 DAQ Meeting

Manuals


Sample data file:


DAQ Subprojects


Analysis Subprojects


Open Issues for the DAQ Module configuration


Configuration parameters to log in the run database

Primary measurement with ACQ164 DAQ

Here are the primary measurements using ACQ164 DAQ. The list will be updated regularly as we take more measurements.

Certificate of Conformity for ACQ1002R(pdf)

9/25/13 DAQ Meeting

 DAQ:
Kabir works with DAQ software, Kabir will be at ornl after oct 7 for longer time
He needs to learn how daq of NPDGamma works.
Michael has a student for online analysis development
DAQ should be available for testing at the end of year

ADCs
seppo has sent a contract to system to move funds to UKy for buying a digitizer
Novikov: Western Kentucky will buy RAID array with the largest disk but with fewer disks
The experiment will collect data some 16Tb.

10/2/2013 DAQ Meeting

Kabir learned from Esti how to control the ADC cards.
Sometime soon we need to decide how to synchronize events from different cards. Let's do it the same way as NPDG.
UKy waiting for subcontract from ORNL to purchase the 5 digitizer boards.
We need to converge on the analog bandwidth (low pass filter setting).

11/6/2013 Organizational Teleconference

DAQ/Analysis - Nadia's discussion slides
Meeting Minutes(pdf)

Minutes

- Kabir is getting ADC to work and has measured again ADC bit noise about 4 ADC bits
- Nadia is ordering Control computer (so ordered, latest arrival date 11/18)
- Seppo is ordering Bridge computer with 2 Ethernet cards
- we need to agree what the ADC clock frequency we are going to use (NF: Starting with 10kHz, samples every 100us, 4/tbin, 41 tbins, 16.4ms)
- Proposed header structure:
(0) Integrity info (a la 0123ABCD)
(1) pulse # (referencing start of run)
(2) time stamp (seconds since 1970)
(3) us time stamp
(4) clock cycle #
(5) Integrity info (a la 0123ABCD)
This is only 6 entries. David suggests we have enough space to add stuff later. I suggest space for 16 (10 spares)
- DAQ Schematic (pdf)

11/13/2013 DAQ/Analysis Meeting

DAQ Current Status
-ADC noise measurement and pre-amp testing (Kabir's Slides)
-Nadia's discussion slides (progress --> last page includes meeting minutes)
-Irakli's slides
Meeting Minutes(pdf)

11/27/2013 DAQ/Analysis Meeting

-Nadia's slides (trigger options)
Meeting Minutes(pdf)

12/04/2013 DAQ Meeting

- DAQ computer arrived
- teleconf with factory/Peter to find out how to tie t0 to data without n x micros time zittering
Meeting Minutes(pdf)

12/05/2013 DAQ Meeting

Meeting Minutes(pdf)

12/18/2013 DAQ Meeting

Comparison of ACQ164 and ACQ2006 (pdf)
ACQ2006 noise measurement revisited (pdf)
Meeting Minutes(pdf)

1/15/2014 DAQ Meeting

Meeting Minutes(pdf)

1/22/2014 DAQ Meeting

Meeting Minutes(pdf)

1/29/2014 DAQ Meeting

Meeting Minutes(pdf)

2/5/2014 DAQ Meeting

Issue with false asymmetry measurement(pdf)

2/19/2014 DAQ Meeting

Status of false asymmetry measurement(pdf)

3/5/2014 DAQ Meeting

Result of false asymmetry measurement(pdf)

3/12/2014 DAQ Meeting

Frequency analysis of previous data set(pdf)

4/09/2014 DAQ Meeting

Meeting Minutes(pdf)

4/17/2014 DAQ Meeting

Wiring (not network) Diagram diagram

4/17/2014 DAQ Meeting

Noise vs Rate for updated firmware(pdf)

4/23/2014 DAQ Meeting

DAQ Status(pdf)
Meeting Minutes(pdf)

4/30/2014 DAQ Meeting

Meeting Minutes(pdf)

5/7/2014 DAQ Meeting

False Asymmetry for Updated ACQ2006(pdf)
Meeting Minutes(pdf)

5/14/2014 DAQ Meeting

Pre-amp board grounding scheme (current pdf)
Necessary optical isolators (pdf)

5/21/2014 DAQ Meeting

Meeting Minutes (pdf)

6/11/2014 DAQ Meeting

Synchronization test slides:
Irakli (pdf)(pptx)
Kabir(pdf)
Meeting Minutes

6/18/2014 DAQ Meeting

Synchronization test slides:
Irakli/Kabir ppt pdf

6/25/2014 DAQ Meeting

Resynchronization test reproduced(Updated fpga Old fpga)

7/02/2014 DAQ Meeting

Testing averaging and decimation (test1) (test2)


9/17/2014 DAQ Meeting

duplication issue with ADC ACQ1002(DAQ_final_tests_sample_dublication.pdf) ()DAQ_final_tests_sample_dublication.pptx


10/1/2014 DAQ Meeting

First tests with wire chambers (WireChamber_Preamp_tests.pptx)(WireChamber_Preamp_tests.pdf)

10/15/2014 DAQ Meeting

First tests with wire chambers (WireChamber_Preamp_tests updated.pptx)(WireChamber_Preamp_tests updated.pptx.pdf)

12/3/14 DAQ Meeting

Some Plots(pdf)
SF signal

01/07/15 DAQ Meeting

DAQ Issues(pdf)

Probing The Hadronic Weak Interaction